Don't Delay a Job

Everybody ever to delay a job or activity that must do right now or about a plan that have made before. That case sometimes we meet in the daily life. Delay a job like become completed the activity everyday. If this attitude has started since they were child so they usually do until they are adult. In each activity they must be delay their job. So then, until when this attitude must go on ?

Why We must delay?
In the Oxford Learning University, delay is an energy that make activity slow or late. Most of us must be ever to do this until this time. Delay duty or work that already given as if already cultured. Without we realize when we delayed our job, it means that we try to accumulate our activities for the next day. Automatically, it cut time which is very important for other activities. So many reason to tell to make the main job forgotten.
Lazy is one of factor, failure put important case as a top priority, commitment which is not clear with the job, less dedication with the activities that must do also environment pushing such as weather. It can be imagine if habit to postpone job not to stop, it must make a lot of lose up in everything. We can lost our time, lost our cost, and lost our energy.

How to Solve?
To postpone a job is a bad habit but we can solve it. Yes it was not easy to change our habit, if it happened since long time. There are several strategy to try to solve our bad habit, such as :
  1. Planning, we need well plan if we want finish our job
  2. Background and purpose, we understand background and purpose about a job. If the purpose is big, we must cut the purpose into a supporting purpose so it makes more clear and can be reach
  3. Priority, if we want to do something big, we must have scale priority. It means that which one that we must to do first and which one that we can do after we finish our main job
  4. Spare Time to identified what we postpone
  5. If our difficult is about how to start, put aside special schedule in the diary so that we can do earlier
  6. Against our saturated (it's a main factor for delay a job) with using our idea
  7. Don't worry if the result is not perfect because it valued is our effort, not just our job

0 comments: